• Featured - Crayola
    • Featured - Tate & Lyle
    • Featured - Cummins

Find a Case Study




  • Our customers include:

    American Express
    General Electric
    IBM
    McDonald's
    Microsoft
    Nike
    PepsiCo
    Royal Dutch Shell
    Toyota Motor
    Walt Disney

     

Anheuser-Busch InBev reduced production line downtime for switching beer brands by 34% and saved more than $430,000.

Read More

With Minitab Statistical Software, the Riverview Hospital Association Lean Six Sigma team was able to perform data analysis to identify patient groups who were scoring lower on patient satisfaction survey questions. This allowed the team to target process improvement efforts to specific patient populations.

Read More

During Boston Scientific’s annual assessment of their materials and processes, the medical device manufacturer used Minitab Statistical Software to analyze data that would validate the pouch-sealing process used to package guidewires. The tools provided by Minitab allowed engineers to confidently move forward with the introduction of a new pouch that streamlined packaging across several departments of the corporation and led to a substantial reduction in material costs.

Read More

Global chemical company Buckman transformed its business by training technical sales associates to use data analysis and Minitab to help customers improve their processes, provide more value to customers, and drive sales—impacting the bottom line.

Read More

During an assessment of its angioplasty process for patients suffering from heart attacks, Cathay General Hospital in Taipei, Taiwan used Minitab Statistical Software to analyze data that would help save lives. The tools provided by Minitab allowed healthcare professionals to confidently introduce new treatment options that led to a decrease in the patients’ hospital stay and an increased savings in medical resources.

Read More

The ability to measure and quantify the variability of their test equipment with Minitab before delivering it to the customer enabled i-Stone to streamline the equipment commissioning procedure and reduced the rework cost by $20,000 annually. 

Read More

« < 1 2 3 4 5 6 7 8 9 10  ... > » 

By using this site you agree to the use of cookies for analytics and personalized content in accordance with our Policy.

OK